Engineering process chart Download

Process Chart 2_18_20. (pdf)Download

Project Mgmnt & Engineering Assistance Flowchart

Stage 1

A

SWCD identifies possible area of need and contacts TSA Project Management Facilitator to begin process discussion. 

B

Request for Assistance submitted to TSA8 Project Management Facilitator by the SWCD Click here for "Request for assistance worksheet & checklist".

C

Onsite visit with Landowner, Project Mgmt Facilitator, &  SWCD

D

Memo prepared by Project Management Facilitator and SWCD


Project Mgmnt & Engineering Assistance Flowchart

Stage 2

Determine All Funding Sources

Federal, Clean Water Fund, State funds other than CWF, Local, 

or Property owner.  

  • Confirm funding has been arranged
  • Define Fund Expiration Date

Prepare Drawing (8 1/2" x 11" Min)

Existing Conditions

  • Contours
  • Aerials
  • Property lines
  • Drainage issues
  • Problem areas
  • Flow direction from roofs, etc.
  • Wetland locations

Additional Information

  • Name of owners
  • Property address
  • Section, Township, Range
  • Photos
  • Historical photos
  • Pictometry

Lake Information: 

  • High Water
  • Low Water
  • Last Reading,
  • OHW

Permitting Required: 

  • State Federal Local

Show Proposed solutions by practice on Drawing

  • Prepare Preliminary Cost Estimate

Contractor / Bid Process

Determine if Contractor will be determined by Bid Process


Project Mgmnt & Engineering Assistance Flowchart

Stage 3

Engineer Reviews Memo

TSA 8 Engineer Reviews Memo from Project Management Facilitator

Engineer Prepares Agreement

TSA 8 Engineer Prepares Agreement based on Deliverable for signature with SWCD and Owner

Project Management Facilitator, & Owner Meet

SWCD, Project Management Facilitator, & Owner Meet to discuss Memo and next steps

TSA 8 begins Project

TSA 8 begin after receipt of signed Agreement from SWCD

  • Send Signed Agreement to Billing (Tasha)
  • Billing prepares invoice and keeps track of hours for design.

TSA 8 Completes Topographic Survey

TSA 8 Completes Topographic Survey

TSA 8 Complete Design

TSA 8 Complete Design

TSA 8 Prepare:

  • Plans
  • Specifications
  • Engineers Opinion of Cost
  • Maintenance and Operation Plan

TSA 8 Submit the following to SWCD

  • Plans
  • Specifications
  • Maintenance and Operation Plan

Collect JPB Engineering Fees from Property Owner

SWCD Collects JPB Engineering Fees from Property Owner

Property Owner Receives the Following From SWCD:

  • Plans
  • Specifications
  • Engineers Opinion of Cost
  • Maintenance and Operation Plan


Request for services pre-screening worksheet & Checklist